Installation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the front
wheelhouse front panel as noted from the original panel.
Drill 8 mm (5/16 in) for plug welding where front wheelhouse front panel
and front wheelhouse overlap.
Clean and prepare the attaching surfaces f ...
Installation Procedure
Create 5 x 18 mm (4/16 x 11/16 in) slots for MIG-brazing along the edges
of the tail lamp pocket as noted f rom the
original panel.
Note:
Clean and prepare the attaching surfaces for brazing.
Position the tail lamp pocket on the vehicle.
Verify the fit of the ta ...
Installation Procedure
Create 8 24 mm (5/16 x 15/16 in) slots for MIG-brazing along the edges
of the underbody rear side rail reinforcement as noted from
the original panel.
Clean and prepare the attaching surfaces for
brazing.
Position the underbody rear side rail reinforcement on the ve ...