OnStar Overview
EmergencyUltra High Strength Dual Phase Steel
This information provides repair recommendations and general guidelines for
steel classified as Ultra High Strength Dual Phase Steel (Dual
Phase Steel with a tensile strength greater than 800 MPa), also known as DPX.
General Motors recommends the following when repairing or replacing this type ...
Installation Procedure
Clean and prepare the attaching surfaces for welding.
Apply structural adhesive to the attaching surfaces.
Position the body rear end panel on the vehicle.
Verify the fit of the body rear end panel.
Clamp the body rear end panel into position.
Spot weld accordingly as no ...
Installation Procedure
Align the rear compartment floor panel.
Drill 8 mm (5/16 in) for plug welding along the edges of the rear compartment
floor panel as noted from the original panel.
Clean and prepare the attaching surfaces for
welding.
Position the rear compartment floor panel on the vehicle.
V ...