Conversions and Add-Ons
General InformationInstallation Procedure
Position the front end upper tie bar (1) on the vehicle.
Verify the fit of the front end upper tie bar.
Clamp the front end upper tie bar into position.
Weld seam accordingly.
Weld seam accordingly.
Grind down weld seams as needed for related panels and components.
...
Installation Procedure
Drill 8 mm (5/16 in) for plug welding along the edges of the front
compartment upper side rail as noted from the original panel.
Clean and prepare the attaching surfaces for welding.
Position the front compartment upper side rail on the vehicle.
Verify the fit of the fr ...
Charging System Light
The charging system light comes on briefly when the ignition is turned on, but
the engine is not running, as a check to show the light is working.
The light turns off when the engine is started. If it does not, have the vehicle
serviced by your dealer.
If the light stays on, or comes on whil ...